Otherwise, this White Water Dam might continue to slumber, until one day it is completely engulfed by the flood of Lin River, disappearing into the river of history.
"Jiang Chuan, help me get the paper and pen, and drive the car closer."
"Okay."
After Jiang Chuan brought the items, Cheng Ye sat in the back seat of the pickup truck, using his knee as a table, and began to sketch.
This was not a typical blueprint, but an engineering drawing deconstructed from his mind.
The original engineering drawings of this White Water Dam have likely been lost long ago, and this hand-drawn sketch happens to provide reference for subsequent construction, avoiding rework and saving time.
From the repair plans for the dam body's cracks, the parts replacement for the gate machinery, to positioning for the installation of water turbines, several key projects that need immediate attention were clearly marked on the drawing.
