Cherreads

Chapter 349 - Chapter 172: Dam Crisis

At the moment he saw the reservoir's water volume, Gu Ji couldn't help but curse.

The official rated total water storage of the Farakka Dam is 9.5 billion cubic meters, but the millimeter-wave water level monitor in front of him shows the actual capacity has exceeded 10.3 billion cubic meters, nearly 10% over the limit, indicating a severe overcapacity.

All 12 gates of the dam are fully opened, with an average flow rate of 1,243 cubic meters per second, while the precipitation detected by the rainwater monitoring system is increasing at 1,365 cubic meters per second.

In other words, even if the tropical storm does not bring any more rain, the dam cannot self-release the floodwaters.

This is the real reason Gu Ji decided to blow up the dam!

"Monitoring technician! Where are the values for dam structure monitoring, seepage monitoring, and seepage pressure monitoring?"

"I, I am the technician."

This is the end of Part One, download Chereads app to continue:
More Chapters