The intensified primary collection entered its final stage under the full weight of residual attention and the active override risk pressing through the bond pathway. Seed control reliability continued to collapse. The conscious decision layer of the Cursed Nebula Physique and the system flickered in and out of availability, each gap longer than the last. The residual wills poured investment through both the second-stage claim and the deepest bond in the circle, treating Elizabeth's remaining capacity as additional residual fuel for the sequence.
[Seed control reliability: 19%]
