Cherreads

Chapter 41 - Chapter 41: The Patent Rollout

Elena sat at the primary routing terminal. Screen displayed the distribution hub map. Six primary nodes. Twelve secondary checkpoints. She pulled up the Vance-Sterling algorithm deployment file. Verified the build version. Confirmed the clearance tags. She typed the execution command. Hit enter. Progress bar loaded. System initialized. Hub one: online. Hub two: online. Hub three: online The sequence spread across the network. Latency checks ran. Packet routing aligned. Data validation completed, The terminal blinked green, Activation complete.

This is the end of Part One, download Chereads app to continue:
More Chapters