Concrete dust settled on the freshly poured apron. Steel brackets bolted to the north wall. New gate sensors mounted at bay three and bay four. LED rings glowed green. Calibration lasers projected straight lines across the staging lane. Elena walked the floor. Tape measure in hand. Boots on wet sealant. Checked clearance tags. Verified spacing. Measured twelve feet between lane markers. Logged the reading. Noted the alignment.
