System notifications flooded Hans's vision. The first one was larger and longer than the deployment notice.
------
[ Structure Name: Tech Center ]
[ Structure Category: Primary Structure — Research and Technology Integration ]
[ Energy Consumption: 400 EU ]
[ Expansion Radius: 1,000 meters ]
[ Structural Systems ]
[ Research Core / Certification Engine ]
Central System research infrastructure responsible for analysis, reconstruction, simulation, research integration and certification.
[ Research Operations Directorate ]
Coordinates research activity, project records, experimental scheduling and research-campus operations.
[ Simulation Cluster ]
Provides high-capacity computational modeling, technical simulation and recovered-data analysis.
[ Secure Intake / Provenance Section ]
Receives recovered data, hardware, samples and technical material.
Maintains source identity and recovery history during assimilation.
[ General Laboratories / Test Bays ]
